Installation price
is strictly Net and is exclusive of VAT, which will be charged at the
standard rate applicable.
-
Installation
Includes
a)
Delivery and off-loading with assistance from Contractor / Customer as
required. b) Transporting to kitchen area. c) Assembling, erecting
and positioning the equipment, fixing in position as necessary and
leaving ready for connection to all services. d) Making all final
connections to those services listed below brought to within one metre
of each item of equipment inlet point by others unless specified
elsewhere within our quote.
-
Gas Services
a) All
final connections will be made within one metre of suitably positioned
isolating gas valves (supplied by others unless specified elsewhere
within our quotation). b) Where equipment is located in a central
island suite then all manifold work is excluded and our final
connections will be made from suitable tee, elbows, etc. located on that
manifold and terminated with a suitable gas / isolation valve. c) All
necessary gas regulators have not been allowed for, unless specified
elsewhere within our quotation. d) Flexible connections have not been
allowed for, unless specified elsewhere within our quotation.
-
Hot / Cold Water
Services
All final
connections to hot and cold water services brought to within 1 metre of
all equipment outlets, terminated by suitable isolators provided by
others, unless specified elsewhere within or quotation.
-
Wastes
a) All final
connections from suitable gully waste “tee” or elbow points etc. brought
to within 1 metre of each item of equipment by others, unless specified
elsewhere within our quotation. All waste pipework and traps will be PVC
solvent weld complete with all necessary “P” traps and rodding eyes. We
exclude any connections to anti-siphon systems. b) If copper waste
are required this would be at extra cost
-
Electrical Supplies
a) All
final connections brought to within one metre of each item of equipment
inlet point. In the case of servery equipment, final connections will be
made to each section of the counter as required. All connections being
made from suitably positioned isolators, spur units, socket outlets,
adaptable boxes, trunking etc. All by others, unless specified elsewhere
within our quotation. b) Earthbonding of any equipment is not include
unless specified
-
Commissioning
Commissioning of the equipment will be carried out on completion of the
installation. If the commissioning process is unable to take place due
to a lack of mains services, then a return visit will be required and
additional costs will be incurred.
-
Protection
On
completion of the installation of the equipment will be protected by
polythene dustsheets only. Any additional protection which may be deemed
necessary owing to site conditions, should be provided by others.
-
Loose Equipment
Many of
our items are considered loose equipment, but have high value, for
example, microwave ovens. We expect a lockable store to be made
available to us for such items for safe keeping until handover.
-
We have assumed
the following:
a) The kitchen is sited on the ground floor and
vehicular access is within 20 metres. b) Access to and from the
kitchen is adequate and any additional charges in connection with the
dismantling of equipment to gain access has not been included in the
installation price. All installation work is to be carried out during
normal working hours and in one continuous visit. c) Adequate
lighting will be provided and for an electrical power supply suitable
for hand tools will be made available within 10 metres of the kitchen
area. d) Provision will be made on site for the disposal of all
rubbish
-
We have excluded
the following
a) Insulation to any pipework b) Mastic sealing
between equipment and structure c) Any builders or joinery work
whatsoever, including holes through walls necessary to run services,
unless specified elsewhere within our quotation. d) Any making good
or decorating on completion of installation, unless specified elsewhere
within our quotation. e) Removal of any doors to gain access f)
Any hoisting, craning, boarding etc. necessary to execute our work.
-
Drawings
On receipt of
order full points and services drawing will be issued clarifying all
required services and requirements. Any further requirements such as
elevations, cross sections would be considered extra. Any design changes
instigated by main contractor / customer etc. will be carried out on a
time and material basis. Up to six copies of the approved drawing can be
issued for construction, any further copies will be issued at a rate of
£4 per copy.
|
|
|
|
|
|